APPLICATION-SPECIFIC CONFIGURATION

LNG Terminal GRE/GRP Piping

Overview

GRE/GRP pipes for LNG terminals mainly includes heat exchange pipe and fire fighting pipe. The heat exchange pipe is used for heat exchange between LNG and sea water to re gasify LNG; the fire fighting pipe is used for water supply of fire fighting system in LNG terminal, and the transmission medium is sea water.

Direct ManufacturerDrawing-Based SupplyExport Support

Product Advantages

  • Fire-proof, anti-static, corrosion resistance, light weight and long service life
01 / Technical Data

Technical Specifications

ISO 14692-2017 Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping

SY/T 6267-2018 High-pressure fiberglass line pipe

SY/T 6266-2024 Low pressure fiberglass line pipe and fittings

IMO A.753(18) 《Guidelines for the Use of Plastic Pipes on Ships》

JC/T 552-2011 Filament-Wound Thermosetting Resin Pressured Pipes

(Product)(Fire rating)(Common specifications)
(GRE) GRE common fire fighting pipeL3DN25-600
(GRE) GRE jacket fire fighting pipeJF/L1DN25-600
(GRP)
GRP Seawater heat exchange pipe
NoneDN100-2200

Note:

the specification, model, pressure level and connection mode can be designed and manufactured according to customer requirements.

02 / Applications

Operating Applications

Marine platforms and ships.

Can be designed and customized according to customers' requirements.

Manufacturing Support

Built for Controlled Oilfield Supply

YUXIN combines product engineering, machining, assembly, inspection and export coordination in Dongying, Shandong.

20+Years of industry experience
5,000+ m²Manufacturing base
40+Equipment sets
30+Core product series
Product FAQ

Before You Request a Quote

What information is needed to confirm the correct configuration?

Send the existing model or drawing, connection dimensions, operating pressure and temperature, well conditions, quantity and destination.

Can this product be manufactured from a drawing or sample?

Yes. YUXIN can review drawings and samples for material, tolerance, machining, inspection and batch-production feasibility.

Which materials and surface treatments are available?

Material and treatment options are selected around pressure, load, corrosion, wear, temperature and sour-service requirements.

How is the product inspected before shipment?

Inspection planning can include dimensional checks, material documentation, assembly review and product-specific pressure or functional testing.

Can YUXIN support distributor and project orders?

Yes. Batch supply, export packing and order documentation can be organized for distributors, service companies and project procurement.

How is final compatibility confirmed?

Website data is for preliminary selection. Final compatibility is confirmed against the approved drawing, specification and purchase requirements.

Engineering Inquiry

Send Product Requirements

Request a Quote

Related Products

Direct Manufacturer

Need a Quotation for Oilfield Parts?

Send your drawing, model, quantity and operating requirements for a focused response.

Contact Sales