Oil Well Christmas Tree
The Christmas tree is an assembly of valves and accessories installed above the tubing head to control oil…
View product
The plug is installed using a conventional bridge-plug procedure. After the operation, the shut-in period is determined according to downhole temperature and fluid conditions.
After approximately 5–10 days, the plug dissolves. Once the well is opened, fluid from the lower interval can pass through the plug channel for normal flowback or production. The plug continues dissolving in the wellbore fluid until it disappears naturally.
| No. | Model | Inner Diameter | Outer Diameter | Temperature Rating | Pressure Rating | Setting Casing | Release Force |
|---|---|---|---|---|---|---|---|
| 1 | 4.5 in | 30 | 95 | 150℃ | 70MPa | 105mm-110mm | 10-12t |
| 2 | 4.5 in | 30 | 90 | 150℃ | 70MPa | 99.56mm-103.88mm | 10-12t |
| 4 | 5 in | 30 | 100 | 150℃ | 70MPa | 108.62mm-114.14mm | 16-18t |
| 5 | 5 in | 35 | 105 | 150℃ | 70MPa | 114.14mm-118.62mm | 16-18t |
| 6 | 5.5 in | 35 | 110 | 150℃ | 70MPa | 118.62mm-124.26mm | 16-18t |
| 7 | 5.5 in | 55 | 112 | 150℃ | 70MPa | 124.26mm-127.26mm | 16-18t |
YUXIN combines product engineering, machining, assembly, inspection and export coordination in Dongying, Shandong.
Send the existing model or drawing, connection dimensions, operating pressure and temperature, well conditions, quantity and destination.
Yes. YUXIN can review drawings and samples for material, tolerance, machining, inspection and batch-production feasibility.
Material and treatment options are selected around pressure, load, corrosion, wear, temperature and sour-service requirements.
Inspection planning can include dimensional checks, material documentation, assembly review and product-specific pressure or functional testing.
Yes. Batch supply, export packing and order documentation can be organized for distributors, service companies and project procurement.
Website data is for preliminary selection. Final compatibility is confirmed against the approved drawing, specification and purchase requirements.
Send your drawing, model, quantity and operating requirements for a focused response.
Share the product, model, quantity and operating conditions. Our engineering and sales team will review the requirement together.