Used for temporary zonal isolation during staged fracturing in cemented casing.
Cast Cable Protector
The protector secures and protects downhole cable on the outside of the tubing, especially at coupling positions where…
View product
01 / 02A temporary isolation plug manufactured from dissolvable material. Depending on well temperature and fluid conditions, the plug is designed to dissolve in approximately 10–15 days and restore the production passage without conventional drillout.
| No. | Model | ID (mm) | OD | Temperature rating | Pressure rating | Setting casing ID | Release force |
|---|---|---|---|---|---|---|---|
| 1 | 4.5" | 30 | 95 | 150°C | 70MPa | 105mm-110mm | 10-12t |
| 2 | 4.5" | 30 | 90 | 150°C | 70MPa | 99.56mm-103.88mm | 10-12t |
| 4 | 5" | 30 | 100 | 150°C | 70MPa | 108.62mm-114.14mm | 16-18t |
| 5 | 5" | 35 | 105 | 150°C | 70MPa | 114.14mm-118.62mm | 16-18t |
| 6 | 5.5" | 35 | 110 | 150°C | 70MPa | 118.62mm-124.26mm | 16-18t |
| 7 | 5.5" | 55 | 112 | 150°C | 70MPa | 124.26mm-127.26mm | 16-18t |
Used for temporary zonal isolation during staged fracturing in cemented casing.
YUXIN combines product engineering, machining, assembly, inspection and export coordination in Dongying, Shandong.
Send the existing model or drawing, connection dimensions, operating pressure and temperature, well conditions, quantity and destination.
Yes. YUXIN can review drawings and samples for material, tolerance, machining, inspection and batch-production feasibility.
Material and treatment options are selected around pressure, load, corrosion, wear, temperature and sour-service requirements.
Inspection planning can include dimensional checks, material documentation, assembly review and product-specific pressure or functional testing.
Yes. Batch supply, export packing and order documentation can be organized for distributors, service companies and project procurement.
Website data is for preliminary selection. Final compatibility is confirmed against the approved drawing, specification and purchase requirements.
Send your drawing, model, quantity and operating requirements for a focused response.
Share the product, model, quantity and operating conditions. Our engineering and sales team will review the requirement together.