LNG Terminal GRE/GRP Piping
GRE/GRP pipes for LNG terminals mainly includes heat exchange pipe and fire fighting pipe. The heat exchange pipe…
View product
Fabric is the main raw material for preparing prepreg material and high performance composite material. The rigid rapier loom can weave a variety of light and heavy yarns into plain, twill, satin and other fancy patterns.
Carbon fibre fabric
| Fabric type | Weaving way | Warp/weft fiber type | g/m2 Fiber gram weight g/m2 | mm Width mm |
|---|---|---|---|---|
| WP/CF 198 | plain | 3K | 200 | 300~1600 |
| WP/CF 198 | 2/2 2/2 twill | 3K | 200 | 300~1600 |
| WP/CF 285 | satin | 3K | 300 | 300~1600 |
| WP/CF 400 | 2/2 2/2 twill | 12K | 480 | 300~1600 |
| WP/CF 600 | plain | 24K | 640 | 300~1600 |
| WP/CF 800 | plain | 48K | 800 | 300~1600 |
Aramid fiber fabric
| Fabric type | Weaving way | Warp/weft fiber type | g/m2 Fiber gram weight g/m2 | mm Width mm |
|---|---|---|---|---|
| WP/AF 280 | plain | 500D | 280 | 300~1600 |
| WP/AF 280 | 2/2 2/2 twill | 500D | 280 | 300~1600 |
| WP/AF 415 | satin | 500D | 415 | 300~1600 |
| WP/AF 623 | 2/2 2/2 twill | 800D | 623 | 300~1600 |
| WP/AF 830 | plain | 1000D | 830 | 300~1600 |
Note:
① fiber weight deviation: ±2%;
② Not limited to the table introduced in the model, can be customized according to customer requirements, fiber gram weight in 200~830g/m2 interval optional, width from 300~1600mm interval optional;
③ Carbon fiber yarn types: 3K, 12K, 24K and 48K, etc. Types of arylon yarn: 100D, 200D, 300D, 500D, 800D and 1000D;
④ Glass, basalt and other fibers are also suitable for weaving.
YUXIN combines product engineering, machining, assembly, inspection and export coordination in Dongying, Shandong.
Send the existing model or drawing, connection dimensions, operating pressure and temperature, well conditions, quantity and destination.
Yes. YUXIN can review drawings and samples for material, tolerance, machining, inspection and batch-production feasibility.
Material and treatment options are selected around pressure, load, corrosion, wear, temperature and sour-service requirements.
Inspection planning can include dimensional checks, material documentation, assembly review and product-specific pressure or functional testing.
Yes. Batch supply, export packing and order documentation can be organized for distributors, service companies and project procurement.
Website data is for preliminary selection. Final compatibility is confirmed against the approved drawing, specification and purchase requirements.
GRE/GRP pipes for LNG terminals mainly includes heat exchange pipe and fire fighting pipe. The heat exchange pipe…
View product
The tool is used during completion and production in different types of oil and water wells to control…
View product
An oilfield pipeline cross is a four-way connection used to divide, combine or redirect oil and gas flow…
View productSend your drawing, model, quantity and operating requirements for a focused response.
Share the product, model, quantity and operating conditions. Our engineering and sales team will review the requirement together.